Call 401-293-4720
Rhode Island cleaning

Post-Construction Cleaning in Rhode Island

Post-construction cleaning clears dust, debris, and finish detail so a renovated space is ready to open. Work is quoted by project, not by hour or square foot, after a walkthrough.

Insured and bonded. Every cleaner is background-checked. 7-day satisfaction guarantee.

Insured and bonded
Background-checked cleaners
7-day satisfaction guarantee
What is included

What this service covers

Get a quote

Get a free post-construction cleaning quote

Prefer to call? 401-293-4720 · therhodeislandcleaners@gmail.com

Who it is for

Who this is for

Contractors, owners, and property managers with a renovated or newly built space. Residential work usually takes 1 to 2 days; commercial work of 3,000 to 10,000 sq ft usually takes 2 to 3 days, with a touch-up clean before delivery.

The full checklist

Every post-construction clean follows this checklist

Approved by you in writing before we start. No surprises.

Dust and debris

Surfaces

Bathrooms

Floors

Detail

Who hires us

Built for the way projects finish

General contractors

Final cleans that keep your punch list short and your handoff on schedule.

Remodelers

Kitchen and bath remodels leave fine dust everywhere. We clear it before the reveal.

Property owners

Renovation finished? We make the space move-in or listing ready.

Landlords

Unit renovations between tenants, cleaned to rent-ready condition.

Realtors

New-construction and flipped homes detailed for showings and photos.

Homeowners

Post-renovation dust removal so you can enjoy the finished space.

Scope matters: Post-construction cleaning is priced by project size and dust level, not by bedroom count. Get the written task list before comparing quotes.

How quotes work

How a quote works

1

Call or book online

Tell us what needs cleaning, where it is, and when you would like it done. Call 401-293-4720 or use the quote form.

2

Free walkthrough

We walk the space, agree the priorities, and note the details the current routine is missing.

3

Written quote

You get a written scope, schedule, and price before the first visit, so you know what is included.

4

A trained crew

Recurring work is done by a trained crew, on the schedule agreed in writing.

Good questions

Good questions. Clear answers.

What is included in post-construction cleaning?

Fine dust, walls, baseboards, window tracks and frames, fixtures, vents, door frames, glass inside and out, hardware polished, and floors, with a final pass before opening.

How is post-construction cleaning priced?

By project, not by hour or square foot. The walkthrough sets the scope and the project quote.

How long does it take?

A small residential job can take 1 to 2 days. A commercial job of 3,000 to 10,000 sq ft usually takes 2 to 3 days. The walkthrough gives the time estimate for the specific job.

Do you do a final pass before handover?

Yes. Fine dust resettles overnight, so the final pass is a separate visit, with a touch-up clean before delivery where it is scoped.

When should post-construction cleaning happen?

After all trades are finished and the space is free of active work. Cleaning too early means dust resettles and the job has to be redone.

Do you remove paint, stickers, and tape residue?

Yes. Stickers, tape residue, and paint specks on hard surfaces are part of the standard post-construction checklist.

How is this different from a deep clean?

A deep clean resets a lived-in home. Post-construction cleaning targets fine construction dust, debris, and new-surface detailing across the whole project.

Can you work around our project timeline?

Yes. Tell us the target handoff date and we schedule the final clean after the trades are out.

Do you clean commercial construction sites?

Yes. Office build-outs, retail fit-outs, and facility renovations are all in scope.

Keep exploring

Related services and guides

Call 401-293-4720Get a quote